9 March 2010

The main spire stone numbers 2,3 and 4. The Masonry has been worked and the stones are ready to be carved.
Trimming in a crocket
Gabreil trimming in a crocket on zone 4
Gabriel trimming in a crocket and Mark dry fixing stone number
Gabriel trimming in a crocket
Mark checking the fillet line
Trimming in crockets. Zone 4 main gablet

Images by Harris Digital Productions